Division sheet D-01
FT Concrete

Commercial and industrial concrete is scheduling, tolerances, and paperwork as much as it is placement. FT Concrete bids the full scope, shows up when the pour is scheduled, and leaves a slab the next trade can build on.
Request a bid
Scope of work
Sheet D-01Slabs-on-grade
Interior floor slabs placed and finished to spec, joints laid out and cut on time.
Foundations & footings
Spread footings, frost walls, and stem walls formed to plan.
Exterior flatwork
Approaches, aprons, walks, and dock pads built for truck traffic.
Equipment & mechanical pads
Housekeeping pads and equipment foundations set to the submittal.
Joint layout & sealing
Control and isolation joints planned before the pour, not after the crack.
How FT delivers
The same sequence on every contract.
- 01
Bid-ready pricing
A scope letter with inclusions and exclusions spelled out, priced from the plans you send, delivered when we say it will be.
- 02
Mobilize on schedule
Crews and equipment show up on the date in the schedule, sequenced with the trades around them.
- 03
Documented closeout
The paperwork, the punch list, and the inspection sign-offs finished before the invoice.
Working beside it
Have a scope to price?
Send plans, an invitation to bid, or a project address. You will hear back within one business day.
