Division sheet D-02
FT Site Services

The site is where schedules are won or lost, and where inspectors spend most of their attention. FT Site Services takes a project from first cut to final stabilization and keeps the paperwork inspection-ready the whole way.
Request a bid
Scope of work
Sheet D-02Sitework & pad preparation
Building pads cut, filled, and proof-rolled to grade.
Excavation
Mass and fine excavation, utility trenching, and backfill.
Stormwater controls
Silt fence, inlet protection, and basin work installed and maintained through the project.
Restoration
Final grading, seeding, erosion blankets, and stabilization that closes out the permit.
Compliance & follow-through
Documentation kept current; when an inspection stalls, FT manages corrections through to sign-off.
How FT delivers
The same sequence on every contract.
- 01
Bid-ready pricing
A scope letter with inclusions and exclusions spelled out, priced from the plans you send, delivered when we say it will be.
- 02
Mobilize on schedule
Crews and equipment show up on the date in the schedule, sequenced with the trades around them.
- 03
Documented closeout
The paperwork, the punch list, and the inspection sign-offs finished before the invoice.
Working beside it
Have a scope to price?
Send plans, an invitation to bid, or a project address. You will hear back within one business day.
